SAMPLE SYNCED PAGE
Field Network Triage Checklist
Once Phase 4 (OneNote Publisher) is connected, any page you drop into your Published section in OneNote will automatically sync here—including all pasted screen snips, tables, and callouts.
1. Physical & Link Layer
- Verify link speed negotiation (1000BASE-T vs 100M fallback on damaged runs).
- Check PoE draw if switch port is cycling.
[OneNote Screen Snip Placeholder — Embedded PNGs from OneNote are downloaded locally and rendered here with click-to-zoom]
2. DHCP / Gateway / DNS Isolation
- Compare default gateway ARP entry against expected VLAN interface MAC.
- Test raw IP reachability (`1.1.1.1`) vs DNS resolution (`Resolve-DnsName`).